Showing posts with label baseboard. Show all posts
Showing posts with label baseboard. Show all posts

Sunday, March 7, 2010

'r dirio dan 'm chorfannau

The baseboard for Cwm Lwch is now completed.
Piece of 3/4" expanded polystyrene, is braced by some 2 1/2" deep strips of the same. On top of that is a piece of 1 1/2" foam cut to the approximate shape of the quarry ledge. Then on top of that I have laid some 3/16" cork tile to lay the track on. It is light and very rigid. I completed the baseboard construction during Saturdays workshop and it certainly fired up peoples enthusiasm to try something different fo baseboards.

Todays blog title means "The ground beneath my feet"...

Friday, March 5, 2010

*Cawn arweiniedig ar gerdded

* I got carried away...
I did, totally and utterly carried away. I was meant to be making some test pieces to demonstrate basboard construction for tomorrows Micro layout workshop. Pieces to show that most any lightweight material can be used as a baseboard if you brace it and protect it well enough. Just test pieces mind, and I ended up making the baseboard for Cwm Lwch. It's 14.25" x 32" for no other reason than I think that is the size that will work. It's made from 1" thick white expanded polystyrene foam a material that everyone tells you isn't suitable for a model railway baseboard. Well, Hitsu was built on white foam, Gonou was too. I have a half finished underground armaments depot layout built on the stuff too so I know it works.

Here underneath you can see the bracing I used to hold the surface flat and level. I think it will work fine for the Cwm Lwch baseboard.
Like I say, it's flat, level and phenomenally light. For those of you who would be concerned about the lightweight polystyrene getting banged about in transit. Well, once the layout gets to a stage where it would be exhibited, it would get boxed up in its own self contained wooden cabinet for protection.
Now, I suppose I still need some demonstration pieces for tommorow as it is...

p.s. I was preparing my materials for this aftenoons workshop just now, and I took a close look at the baseboard now that the Loctite powergrab foamboard adhesive has set fully and I have to say that now the baseboard is extremely rigid.